Shipping & Delivery Policy
Transparent flat-rate transport frameworks and delivery clearing guidelines across our structural staging networks.
Tilt-Bed Delivery
Ground placement options straight to your job site zip code.
ISO Certified Fleet
Wind, water, and cargo-worthy transit parameters.
Standard Lead Time
7-14 commercial business days for stock container cargo boxes.
1. Logistics Scope & Operational Overview
Forge Container Group manages dedicated heavy-equipment logistics channels out of strategic staging hubs. Our distribution operations ensure all standard cargo units, modular custom builds, and industrial spare components comply fully with global transport infrastructure standard frameworks before dispatch.
2. Order Processing & Modification Lead Times
Standard raw containers (20ft, 40ft, and 53ft units) require 3 to 5 business days for systematic structural inspections. Turnkey custom structural buildsāincluding modular architectural container pools, office setups, and climate control configurationsāinvolve variable fabrication schedules ranging between 3 to 6 operational weeks depending on architectural complexity.
3. Flat-Rate Freight & Geographic Delivery Mapping
Freight pricing is strictly calculated based on mileage matrices mapped outward from our regional fulfillment centers to your specified destination zip code. All calculated logistical shipping fees are presented as transparent flat rates directly inside your itemized corporate invoice documentation to eliminate surprise overhead fees during site drop off.
4. Customer Site Preparation Guidelines
The purchaser assumes absolute responsibility for site clearing readiness before the arrival of heavy transport trucks. Delivery corridors must be completely level, dry, and capable of sustaining the extreme combined weight load configurations of commercial trucks, chassis platforms, and fully loaded steel container equipment panels.
5. Drop Zone Offloading Clearance Space Requirements
Tilt-bed transport configurations require a linear unobstructed path of at least 60 feet to drop off a 20ft container block, and 100 to 120 feet of direct linear alignment space for 40ft and 53ft container configurations. Overhead clearances must maintain a minimum threshold of 14 feet to safely clear utility structures, hanging branches, and structural wires.
6. Regulatory Delivery Boundaries & Limitations
Our logistical operations run strictly within cross-continental infrastructure pathways. If deep off-road drops or complex terrain environments prevent safe mechanical positioning of standard trailer trucks, our dispatch drivers reserve the right to offload cargo at the closest accessible public or commercial access boundary point.
7. Cargo Tracking & Delivery Confirmation
Upon final dispatch approval, customers receive automated logistics alerts containing expected delivery dates and scheduling information. The designated client site manager or property owner must remain physically present during the arrival window to sign off on visual quality confirmation sheets and final drop clearances.